prefabricated cleanrooms

SPECIAL EDITION: Ask the Quality Expert

How does G-CON ensure that my G-CON POD will be able to meet our cGMP needs?

By: Tom Ronat, Director of Quality Assurance

From day one, G-CON works with the customer to determine the requirements for the specific application. Our Commissioning team verifies that each requirement that has an impact on Quality (potential impact to the final product) is tested. G-CON provides an Acceptance Testing Strategy document to the customer in advance of the Factory Acceptance Test and Site Acceptance Test so that commissioning efforts are well understood prior to engaging in the same.

This special edition of Ask the Engineers gets an answer from G-CON's Director of Quality Assurance, Tom Ronat.

  • White Facebook Icon
  • White LinkedIn Icon
  • White Twitter Icon
  • White Instagram Icon
  • White Google+ Icon
  • White YouTube Icon

Physical Address

G-CON Manufacturing, Inc.

6161 Imperial Loop

College Station, TX 77845

Mailing Address

P.O. Box 15922

College Station, TX 77841

Contact Us

Phone 979.431.0700

Request Information

Brochures and  product info

© 2019 G-CON MANUFACTURING, INC.| ALL RIGHTS RESERVED | ARTICLES