Nov 19, 2025

G-CON x TrueBinding Case Study

G-CON provided the engineering design, build and delivery of prefabricated cleanroom PODs for TrueBinding, totaling a 3,000 sq. ft. footprint of ISO 7 and ISO 8 space. The manufacturing site at their Hayward, CA facility is designed to produce novel mAb therapeutics and incorporates suites for USP/DSP, Post Viral, and Media/Buffer Prep operations. In this case study, see the challenge the customer faced and the solution brought by G-CON.

Read Now